Today In Disney History ~ January 23rd
“The Mark V trains were built by Ride & Show Engineering, Inc., incorporating bodies that were produced by Messerschmitt-Bolkow-Blohm of Germany. Purple first made her appearance for testing in Autumn of 1986 and began regular operations a few months later. Orange was delivered in late Summer of 1987, followed by Blue in early 1988. The oldest train, Red, was also the last to be removed from the line for refurbishment in the Spring of 1988.
The beamway path was re-aligned into the Eeyore section of the parking lot in 1994 to accommodate the construction of the Indiana Jones Adventure show building. The trains were fitted with new electrical pick-up shoes and tail view cameras enabling two-train point-to-point shuttle service where the first arriving train was disembarked, moved along empty to just beyond the station, the second train arrived, disembarked, embarked and dispatched so the first train could be loaded and dispatched for the return. In 1999, the monorail began lengthy periods of closures due to construction of the Disney California Adventure theme park, which the monorail beamway passed through which had formerly been the parking lot. Although the beamway’s route was not altered, a significant amount of construction was done around the existing beamway, and much of the terrain under the beamway’s support columns was regraded, necessitating the closures. Additionally, the Disneyland Hotel Station and all of its nearby hotel structures were completely demolished and a new station built in the same location. General admission was required to board at the Downtown Disney station. Downtown Disney Station is treated as a second gate into Disneyland Park, so a general admission passport or valid annual pass must be presented to ride the monorail and the tail-cone tour is no longer offered.
The system resumed limited shuttle operations in 2000, when the Downtown Disney Station became operational, but a significant portion of the beamway was still unusable due to construction. In 2001 the monorail resumed full capacity forward direction circuit operations, passing through Disney’s Grand Californian Hotel & Spa as well as showcasing the new park.
In 2004, Monorail Orange was removed from the line and taken to Walt Disney Imagineering in Glendale to be reverse engineered. Monorail Blue was removed in September 2006 for rebuilding. The Finding Nemo Submarine Voyage show building was extended into the lagoon beneath the monorail which closed from August 21 through late December 2006 to prepare for the 2007 opening of Nemo.
The refurbishment from Mark V to Mark VII was done one train at a time. There was no Mark VI at Disneyland, as Mark VI are used on the Walt Disney World Monorail System. The first Mark VII train, Monorail Red, arrived at Disneyland on December 20, 2007. It was originally expected to be in service by the end of February 2008, but due to design change issues, it did not begin serving park guests until July 3, 2008. Mark VII Blue arrived on-site on April 10, 2008, began daytime riderless testing on August 1, 2008, and began guest service on September 16, 2008. Monorail Mark VII Orange arrived on-site on August 14, 2008, began riderless testing in March 2009, and began guest service on April 7, 2009. The entire Mark VII Monorail fleet consists of three trains – Red, Blue, and Orange.”
TMSM Today in Graphic by Sherry Rinaldi DeHart; Info from Wiki
- Jack Skellington’s Sandy Claws Cookies ~ A Fun Suggestion for Holiday Baking! - December 22, 2024
- 10 Facts About The Nightmare Before Christmas - December 21, 2024
- Lumiere’s Christmas Candle Cupcakes #disneyholidays - December 21, 2024